0452 201 786 info@eacleaningservice.com.au ⚑ 2 Parry St, Fremantle WA 6160

Builder Cleaning

From trade dust to handover-ready.

Construction dust does not behave like household dust. It is fine, abrasive and it settles back down for days, which is why a single pass with a domestic vacuum never gets a site clean enough for handover.

We work the three recognised stages of a builders clean, use HEPA-filtered commercial equipment, and remove the paint spots, silicone smears, adhesive labels and render splatter that trades leave behind.

Get a free quote
Builder Cleaning
What's included

Everything on the list, every time

Stage 1 — rough clean

Rubbish and offcut removal, sweep down, and a first pass on floors so other trades can finish safely.

Stage 2 — detail clean

Full dust-down of ceilings, walls, ledges, frames and cavities, plus cupboard and drawer interiors.

Stage 3 — final clean

Presentation finish: glass, fittings, tapware and floors detailed immediately before handover or first inspection.

Paint & residue removal

Paint spots, render splatter, silicone smears, plaster dust and sticker or protective-film removal from glass and appliances.

Floors

Grout haze removal, sealing prep, hard floor scrub and polish, and carpet extraction where carpet is already laid.

Glass & frames

New-build glass detailed inside and out, including tracks, rubbers and frames where safe to access.

How it works

Four steps, no surprises

1
Walk the site with us

Send plans, photos or a site address. We work out scope, stage and access requirements.

2
Fixed price per stage

Quoted per stage so you only pay for the passes you actually need.

3
We work around trades

Early starts, after-hours and weekend work are available so we do not hold up your program.

4
Handover check

A final walkthrough with your site supervisor before we sign off.

Questions

Builder Cleaning FAQs

Are you covered for site work?

Yes. We carry public liability insurance and our team is inducted, wears the required PPE and follows your site rules.

Can you clean before practical completion?

Yes. Most builders book us for the detail clean before final inspection and again for a light final clean after defects are closed out.

Do you remove building rubbish?

We remove loose rubbish, packaging and offcuts as part of the rough clean. Skip hire and disposal of heavy or regulated waste is quoted separately.

How much notice do you need?

Two to three business days for a standard residential build. Large or multi-unit sites should be booked a week ahead so we can put the right size crew on it.

More questions? Read the full FAQ.

Where we work

Builder Cleaning across Melbourne

Other services

You might also need

Free Quote

Tell us about your place

Fixed, all-inclusive pricing. Most quotes come back within the hour during business hours — or call 0452 201 786 and speak to our team directly.

0452 201 786

No obligation. We never pass your details on.

Call Now Get Quote